Industry news|2022-06-06| admin
The installation of the planetary gearbox is a relatively simple process, but some details need to be paid attention to during the installation process. The installation process of the planetary gearbox is roughly divided into three steps: inspection size, installation, and testing. The main thing is to confirm the planetary gear. The coaxiality of the gearbox during installation will have a great impact, so let's learn about the installation process of the planetary gearbox and some precautions!
Before installing the planetary gearbox and the motor, it is necessary to confirm whether they are in good condition, and it is necessary to check whether the dimensions of the connected parts match, mainly referring to whether the installation size between the motor and the gearbox is correct.
Send the screws of the dust-proof holes on the outer side of the planetary gearbox, adjust the position to align the side holes and the dust-proof holes, remove the motor shaft key, and carry out anti-rust treatment on the installation parts of the motor and the gearbox to ensure the tightness of the connection and the later operation. of fluency.
When connecting, it is necessary to ensure that the coaxiality between the two is consistent. If it is inconsistent, it will affect the later operation, wear the internal gear of the gearbox or break the shaft. During the installation process, it is forbidden to hit the gearbox with a hammer to prevent damage caused by excessive axial force or radial force.
When the gearbox and the motor are connected, first install the diagonal screws to ensure uniform force, then install the other two diagonal bolts, tighten the four mounting bolts one by one, and finally tighten the captive screws on both sides, some high-precision installation requires the use of a torque wrench.
After the gearbox is installed, it needs to be fixed on the bracket, and the stability of the installation needs to be ensured. If the gearbox is unstable during high-speed operation, it may cause vibration and external noise, which will indirectly affect the coaxiality of the installation. When gears or other components are externally installed during transmission, protective devices need to be installed. After the installation is completed, check the stability and flexibility of the installation parts in turn, and the idling test can be carried out. The operation process should be relatively stable, without obvious vibration and noise. When there are some abnormal phenomena, the problem should be eliminated.
The planetary gearbox needs to be carefully installed during the installation process. Good installation can achieve twice the result with half the effort. Installation according to standard procedures can save a lot of maintenance costs in the later period. If the coaxiality is inconsistent during installation, it will have a great impact on the later use and the gearbox itself. Therefore, during the installation of the gearbox, attention must be paid to the coaxiality of the gearbox and some details.
| 嫩草乱码一区三区四区 | 欧美日韩中文字幕 | 精品少妇人妻av无码中文字幕 | 亚洲av高清无码 | 一级BBBBBBBBB毛片视频 | 亚洲精品无码一区二区三区在线观看 | 国产做a爱片久久毛片A片漫画 | 午夜精品福利一区二区三区蜜桃 | 精品久久久久久亚洲综合网 | 国产熟妇 码视频户外直播 | 国产精品久久久久久AV中晋 | 91精品人妻少妇无码影院 | 成人网站入口直接进外面观看入口 | 日韩三级电影久久 | 亚洲无码视频一区二区 | 少妇特黄A一区二区三区滕西远 | 国产在线播放国区 | 国产亲子乱婬一级A片 | 国产成人AV自拍 | 国精品无码一区二区三区在线秋菊 | 国产农村妇女精品一区 | 国产无人区码熟妇毛片多 | 成人在线免费观看 | 特级西西WWw44高清大胆图片 | 无码人妻精品一区二区蜜桃苍井空 | 国产午夜无码精品 | 亚洲av成人电影 | 6699嫩草久久久精品影院 | 广西女人一级毛片 | 国产做爰14XXXⅩ高潮视频 | 欧美交换乱婬A片免费 | 强行糟蹋人妻HD中文 | 色欲蜜乳熟妇精品久久 | A片 XXXX受爽直播 | 国产精品久久久久久久久久久免费看 | 国产一区二区高清 | 一级A片60分钟免费看 | 在线亚洲AV无码秘 蜜桃医院 | 四季AV中文字幕 | 久久免费视频精品 |